rail

Tolworth Station

CASE STUDY Robert West delivered civil engineering design services for the refurbishment of Tolworth Station, including platform resurfacing and drainage upgrades. The project required a flexible and responsive approach due

Read more »

Old Oak Common Abutment Stability

CASE STUDY Existing scenario: Raking pile remedial system at toe of abutment wall stabilising the existing abutment against geotechnical failure. System required demolition to facilitate installation of permanent works (new

Read more »

Old Oak Common Central Line Bridge

CASE STUDY Robert West designed temporary works to repurpose a 17m-span plate girder U-deck bridge as a haul road for plant, including a 75te piling rig. The solution involved structural

Read more »

Berrylands Station

CASE STUDY Berrylands Station project addresses the poor condition of existing platforms. Works involve demolishing timber platforms and constructing new pile foundations and steel sections. Robert West reviewed the station

Read more »

Northbrook Outrigger Foundations

CASE STUDY Robert West Consulting provided temporary works design for crane outrigger foundations to support the installation of a new DC module at Northbrook Substation. To ensure safe and efficient

Read more »

Fratton Footbridge

CASE STUDY Fratton Footbridge (17A/10) spans six electrified tracks at Fratton Station, comprising three riveted steel plate girder spans on cast iron columns. The structure was assessed as overstressed, requiring

Read more »

Cavendish Road Underbridge

CASE STUDY Robert West Consulting was engaged by Volker Fitzpatrick, acting as part of the Southern Renewals Enterprise (SRE), to provide comprehensive structural engineering services for the Cavendish Road Underbridge

Read more »

Prince of Wales Bridge

THE BRIEF Access to maintain major structures is difficult! Robert West, along with our design partners David Price Consulting and Pennine Controls, have been appointed by Amey on behalf of

Read more »

CP7

THE BRIEF Robert West Consulting is working with the Southern Renewals Enterprise (SRE) under VolkerFitzpatrick on several asset renewals schemes. These schemes include station canopies and platforms, rail bridges and

Read more »

Old Oak Common

THE BRIEF Permanent and temporary works design services to support the installation of 2no reinforced concrete and 1no steel deck rail over road bridges and supporting ancillary works at Old

Read more »
  • Home
  • Our story
  • Sectors
  • Skills
  • Projects
  • Careers
  • Home
  • Our story
  • Sectors
  • Skills
  • Projects
  • Careers
  • +44 (0) 203 7737 880
  • london@robertwest.co.uk
  • 1 Paris Garden SE1 8ND LONDON
Linkedin
  • Disclaimer
  • Privacy Policies
  • Cookies

Robert West Consulting Ltd • Place of registration: Cardiff • Registered number: 2901674 • Registered office address: 147a High Street, Waltham Cross, Hertfordshire, EN8 7AP • VAT number: 646114257
® Robert West 2024. All rights reserved