Old Oak Common
THE BRIEF
Permanent and temporary works design services to support the installation of 2no reinforced concrete and 1no steel deck rail over road bridges and supporting ancillary works at Old Oak Common.
Robert West Consulting’s services include coordinating and producing the reinforcement detailing (permanent works), structural assessments of existing assets for temporary works designs, various geotechnical design packages and other temporary works packages.
VALUE-ADDED SOLUTION
For the permanent works design services, Robert West Consulting used existing reinforcement intent information to produce detailed designs which considered installation constraints, permanent works design requirements and general design efficiencies.
Regarding temporary works designs, Robert West Consulting worked closely with VolkerFitzpatrick to manage a challenging design programme with changing priorities. Furthermore, Robert West Consulting Engineers attended site for reactive works and supported the project with on call support on several occasions.
FINAL OUTCOMES
Several temporary works designs have been implemented by VolkerFitzpatrick and the permanent works are under construction. Robert West Consulting continues to support VolkerFitzpatrick in the scheme.